Mission 100 - SUCCESS!

CSPA Technical Bulletins


Notice to all CSPA Riggers.

In an effort to fall in line with the current “go-green” philosophy, the T&SC is attempting to cut down on the amount of paper used in many of our day-to-day transactions. Therefore, the publication of Technical Bulletins in hard copy will gradually be phased out. Effective 01 April 2010 Technical Bulletins will only be available in electronic format. Until that time, riggers that wish to continue receiving Technical Bulletins in paper format must contact the CSPA office to inform them of their wishes. Those that do not contact the office will be removed from the mailing list and will need to access the CSPA website for the latest Technical Bulletins. It is the opinion of the T&SC that those in positions of responsibility, i.e. Rigging Technicians, need to maintain contact with the industry with some regularity by scanning the various manufacturer’s websites for current updates, upgrades, bulletins or other relevant information that may need to be identified so that they are able to service their clients in a safe manner. This can only be accomplished by having access to the information network offered with Internet access.
T&SC – March 2009

The following documents are available for download. All are PDF files requiring Adobe Acrobat Reader

Bulletin Date Issued Description / Items in Bulletin
Bulletin #107 May 23 2013 Item #1 - United Parachute Technologies Service Bulletin #20132005
Bulletin #106 March 23 2013 Item #1 - United Parachute Technologies Service Bulletin #20121106
Bulletin #105 March 2013 Item #1 - Sun Path Service Bulletin # SPSBOO8
Bulletin #104 February 2013 Item #1 - Airtec Service Bulletin #C2 0113
Item #2 - New Rigger Training Program 
Bulletin #103 April 2012 Item #1 - Parachute System Decelerator Reserves and Vortex 2 Systems
Item #2 - Changes to CSPA Rigger A system 
Bulletin #102 January 2012 Item #1 -Sigma Sport Tandem Systems
Item #2 - Changes to CSPA Rigger A system 
Bulletin #101 October 2011 Item #1 -Vigil AAD Bulletin 
Bulletin #100 May 2011 Item #1 -Vector 3 Inspection 
Bulletin #99 March 2011 Item #1 - ARGUS Approvals Cancelled 
Bulletin #98 March 2011 Item #1 - Icon Containers with Skyhook Installed
Item #2 - Substandard Loop Washers 
Bulletin #97 Dec 2010 Item #1 - AAD Issues
Item #2 – Rigger's Forum 
Bulletin #96 Sep 2010 Item #1 - ARGUS AAD Cutters
 
Bulletin #95 Nov 2009 Item #1 - Vigil AAD Cutters
Item #2 – Rigger Forum 
Bulletin #94 June 2009 Item #1 - Substituting Components
Item #2 – Infinity Supplement 
Bulletin #93 April 2009 Item #1 - Read the Manufacturer’s Instructions
Item #2 – TB’s in Hard Copy
Bulletin #92 February 2009 Item #1 - Javelin Odyssey Immediate Inspection
Item #2 – Rigger Gatherings
Bulletin #91 January 2009 Item #1 - UPT Product Improvement Notice
Item #2 – Safety Awareness Day
Bulletin #90 July 2008 Item #1 - Vigil Cutters
Bulletin #89 Apr 2008 Item #1 - CYPRES 2 Recall
Bulletin #88 Apr 2008 Item #1 - Wings Mid-flap Stiffener
Item #2 – Wings Main Canopy Line Stows
Bulletin #87 Feb 2008 Item #1 - ICON AAD Cutter Placement
Item #2 – “Continuous” Ratings
Bulletin #86 Dec 2007 Item #1 - ICON Grommets
Item #2 – Rigger Forum
Bulletin #85 Oct 2007 Item #1 - Racer Tandem Flex Pin
Item #2 – Rigger Forum
Bulletin #84 May 2007 Mandatory Removal of 'Flinger/PRO' System on Quasar ll
Bulletin #83 Mar 2007 Soft Links on Reserve Parachutes.
Bulletin #82 Feb 2007 Item #1 - Argus AAD system, issued bulletin (SB AMM021206/2) which states that the "old style" cutter with plastic insert is to be replaced on all container systems.
Item #2 - United Parachute Technologies has issued service bulletin (SB300107) requiring inspection of all tandem loop-style reserve ripcords installed prior to October 2004.
Bulletin #81 Dec 2006 Argus AAD system, issued bulletin (SB AMM021206/1) on December
2nd, 2006 which affects their product installed in Mirage harness/container systems.
Bulletin #80 Sept 2006 Techno 240-B Reserve Parachutes & Rigging Innovations does not approve the installation and/or use of the Vigil AAD in any RI product.
Bulletin #79 May 2006 Aviacom SA, manufacturers of the Argus Automatic Activation Device, have issued Service BulletinAMM290506/1 following the ground firing of one of their units.
Bulletin #78 Apr 2006 #1 Emergency Airworthiness Directive grounds all Parachutes de France TECHNO 240-B reserves. #2 – Damage to Vigil Cutters: Advanced Aerospace Designs requests riggers look at plastic loop protection heads of the cutter(s) on AADs to ensure they have not been damaged.
Bulletin #77 Dec 2005 Sun Path Products, Inc. have issued a mandatory recall for Javelin systems manufactured between February 2002 and October 2002 with reserve containers constructed of Red 1000D Cordura. Immediate compliance required.
Bulletin #76 May 2005 Aerodyne Systems has issue a mandatory bulletin requiring a qualified rigger to clean the release cables and housings on all their ICON Harness/Container Systems.
Bulletin #75 Feb 2005 Parachute Labs Jump Shack SST/Racer, Racer Elite and Racer Trainers - all models equipped with a single-strand adjustable main lift web harness.
Bulletin #74 Jan 2005 Cypres® units that have reached their maximum service life must be removed from service
Limitations of Rigger "A" holders who do not have the "continuous" rating.
Bulletin #73 Jul 2004 Mandatory grounding of Javelin® Student and Student Odyssey containers
Upgrade available for Aerodyne Icon® containers
Packing instructions for old or obsolete containers.
Bulletin #72 Apr 2004 Vigil® AAD Recall
PdF Reserves
Parachutes Australia Service Life of Harness/Containers
Bulletin #71 Jan 2004 Relative Workshop® Skyhook RSL
CYPRES 2 Glitch
Bulletin #70 Jul 2003 Capewell® Supplied Pins and Ripcords
Bulletin #69 Jun 2003 Mirage® System Recall - Soft Reserve Ripcords
Soft-Links on Reserves
Bulletin #68 Aug 2002 Inspection of Swift® Reserves
Bulletin #67 Jan 2002 Mandatory Repairs to Precision® Canopies
Bulletin #66 Dec 2001 Dual Hawk Pin Replacement
Foreign Equipment in USA
180 Day Repacks for Exhibition Jumps
Main Parachute Packing
Bulletin #65 Aug 2001 Fliteline Systems
Jump Shack - Ripcord Pin Inspection
Parachutes de France - Atom Tandem BT80 Damaged
Bulletin #64   Airtec Confirms "Lifeing" for Cypres
Riggers Packing Cypres-Equipped Rigs
Main Riser Testing on Rigging Innovations Containers
Bulletin #63 Sep 2000 Dual Hawk Tandem Closing System
AAD Maintenance
Bulletin #62 Aug 2000 Altico Bulletin
PIA Links
Rating Information
Bulletin #61 May 2000 Tandem Vector Modification
Closing Loops
Loose Fitting on Vectors
The Grommet Question
Changes to Rigger Currency Requirements
Bulletin #60 Feb 2000 Airtec 2-pin field replaceable cutter
Fliteline Systems
Bulletin #59 Dec 1999 Changes to Reserve Repack Cycle
Bulletin #58 Nov 1999 Strength Testing Reserves
Safety Stows on Reserve Deployment Bags
Bulletin #57 May 1999 Item #1 Closing Loop Attachment
Item #2 Pro-Packing Temp Reserves
Bulletin #56 Jan 1999 Astra AAD Update
Flightline Systems Reflex
Bulletin #55 Sep 1998 Chute Shop of SA Canopies
Vector Release Housing Fittings
Incorrectly Packing Pilot Chutes on Reflex Rigs
Bulletin #54 Apr 1998 Tandem Vector Reserve Steering Lines
Jump Shack Cable Inspection
Vector Tandem Mandated Changes
Racer Tandem Brake Setting
Bulletin #53 Jan 1998 Modifications to Mirage Systems
Electro-magnetic Shielding for CYPRES
Index Update
Bulletin #52 Nov 1997 Deactivation of Tandem RSL's
Velcro-less Toggle Brake Hang-ups
AAD Maintenance
Bulletin #51 Apr 1997 Soft Housings
Soft Riser Rings
EOS Reserve Pilot Chute Upgrade
Strong Enterprises Bulletin
Bulletin #50 Oct 1996 Astra Upgrades from FXC
Storage of Parachutes
Bulletin #1-49   File is 759K in size, covers bulletins issued roughly 1980 to April 1996